In order to promote the improvement of equipment maintenance service quality of quilt production line, the development of quilt production line after large and small flat leather must be based on the social division of labor and the spirit of mutual learning and supervision, mutual exchange and cooperation, and handover and acceptance one by one. Grinder A spinning machine that turns fiber strands into rovings. The main function is to draft and twist, and to wind the roving into a certain package to meet the processing requirements of the spinning frame.
Special equipment for the textile industry on the winder. As the last process of spinning and the first process of weaving, winding is the link between the past and the next.“bridge”Therefore, it occupies an important position in the textile field. During the spinning process of the spinning frame, the semi-finished roving or sliver is drafted, twisted, and wound into a spinning machine. The combed sliver and the needle-carding machine combine the sliver, the needle row is drafted to improve the sliver structure, and the roving is further spun into spun yarn on the ring spinning frame, which is the main spinning machine.
Handover and acceptance are divided into preliminary handover and final handover. (1) After the preliminary handover and trial operation, the maintenance team leader will hand over to the maintenance worker or the maintenance team leader, and the maintenance worker or the maintenance team leader will check other items item by item according to the technical conditions of the handover. Equipment without initial delivery is not permitted to be put into operation.
figure 2. After the arduous step of handing over the equipment, the small flat car passed three classes, and the large flat car passed the operation inspection period of nine classes. During the inspection, if any work and accident caused by the poor quality of the flat car are found, it should be recorded in the handover order and the security team will repair it before the final handover.
After the initial handover, the maintenance personnel are responsible for the maintenance of the equipment. General defects found during maintenance should be repaired by maintenance personnel. 3. The testing, laboratory and electrical management departments can measure the production process technology of the equipment of large and small flat cars according to the progress control requirements, and organize Li Jian to be responsible for reflecting the mechanical defects produced by the machine after the large and small flat cars of the enterprise. relevant data are presented.
(2) Final handover 1. Within seven days after the initial handover, the security foreman, maintenance foreman or shift foreman will check the machine defect repair research situation and process analysis to determine the experimental results, and the final grade will be processed according to the handover information technology development conditions. handover. If we find that the company can repair the shortcomings that have not been repaired during the student review period, or the process method determines that the effect is bad, the security team will continue to repair them after the final handover. 2. When the measurement result of a certain process requirement cannot correctly reflect the quality of the repair due to changes in the objective situation, the two parties shall conduct research and analysis, and with the consent of the full-time machine plume, and report to the production director for approval, the limit of the process requirement can be adjusted. and rated against the new required limits.
cotton fabric waste recycling machine